ROADS & BRIDGES...Continued

UPGRADING FEDERAL ROUTE 3 AT LALUAN 3, KM97.4-108, JALAN KUALA TERENGGANU-KUANTAN, TERENGGANU
Jabatan Kerja Raya (Public Works Department) JKR
Design and construction for an improvement of the existing Federal Route 3 by providing for increased traffic capacity via pavement widening from 2 single lane carriageway to 2 lane dual carriageway, improving quality of traffic flow by signalized junction, U-turn treatments, removing minor junctions, widening on curves allowing for faster traffic flow and reduce delay. Design and construction of two bridges over Paka river and Kerteh river.
2002-2004 MORE

DESIGN, BUILD AND PROVIDE PERMANENT ENTRANCE TO THE SOLID WASTE TREATMENT PLANTS, THERMAL OXIDATION PLANT (TOP) IN THE FEDERAL TERRITORY OF LABUAN
Jabatan Kerja Raya (Public Works Department) JKR
Detailed engineering design for a new access road to connect the completed Thermal Oxidation Plant (TOP) to Jalan Patau. The works included 750 2 way dual carriageway road, 750m 2 way single carriageway road, Traffic control Junction, 3 span bridge over Sungai Rancha-Rancha which allow small maritime boat to fo underneath, permanent diversion of Sg. Rancha-Rancha. Stabilization works included ground improvement using Prefabricated Vertical Drains, geotextiles, surcharging and installation of Reinforced Soil Walls and permanent sheet pile wall.
2007 - 2010

CONSTRUCTION OF SKUDAI INTERCHANGE, JOHOR BAHRU, JOHOR DARUL TAKZIM
Zainal & Mohamad Sdn Bhd
Designing an improvement of Junction of Jalan Pontian (Federal Route 3) and Jalan Senai - Johor Bahru (Federal Route 1) by introducing trumpet interchange further to the recommendation of traffic impact assessment. The works included elevated roads and ramps of the trumpet interchange, bridge over the tributary, two bridges over SAJ Pipelines, retaining wall, ground improvement, existing roads and junctions improvement, pedestrian bridge and five dedicated u-turns.
2004 - 2006

JALAN PAYA BERENJUT ROAD EXTENSION PROJECT, KEMAMAN, TERENGGANU.
Mesh Engineers Sdn Bhd
Detailed engineering design of a new 1.3km stretch of 2 way single carriageway of JKR R3 standard rural road in Kemaman, Terengganu connecting Kg. Paya Berenjut and Kg. Mak Lagam known as Projek Sambungan Jalan Raya Berenjut, Kemaman, Terengganu Darul Iman.
2005

VILLAGE ROAD PROJECT TEMPINIS TO PONDOK PAKU, BESUT, TERENGGANU
Perunding MZH Consulting Engineers
Detailed engineering design to construct a new road linking Kg Tempenis and Pondok Paku to improve the road transport system in these rural areas. The works included two-lane single
carriageway to R3 standard with a design speed of 70km/hr and total road length of 4.60 km. 30m length of 1 span integral bridge across Sg Kerandang , 25m length of 1 span integral bridge across tributary of Sg Kerandang and 30m length of 1 span integral bridge across sg. Bakap. Ground Improvement using Prefabricated Vertical Drain, geotextiles and surcharge.
2005 - 2007

 

NEXT PAGE >>

PROJECTS/SERVICES
Master Plans   Infrastructures   Structures    Sewerage    Roads & Bridges     Geotechnical    Environmental   

We are at:
2A, PUSAT REKREASI SHANG VILLA, LOT G-3, JALAN SS7/15, 47301 KELANA JAYA, PETALING JAYA,
Selangor, Malaysia.
Telephone: 603 - 7806 1638, Fax: 603 - 7806 1138

Email : askgea@gea.com.my  



Home Page     Services    Our Clients     Projects    Careers    News    Documents    Publications    BooksHome Page     Services    Our Clients     Projects    Careers    News    Documents    Publications    Books