ROADS & BRIDGES

 

THE NEW LCC TERMINAL AND ASSOCIATED WORKS AT KL INTERNATIONAL AIRPORT, SEPANG, SELANGOR
Malaysia Airports Holdings Berhad
Package LF05 - Terminal Approach Road
Package LF06 - Perimeter Roads and Security Roads & Fencing
New road network development for the new Low Cost Terminal together with associated works at Kula Lumpur International Airport, Sepang. Detailed design and construction of approximately 20Km of road including road network outside the airport area and part of road works inside the airport area. (Perimeter Road and Security Road with security fencing). Part of this road system comes under perview of Public Works Department (JKR). The project is located on very soft peaty subsoils conditions which requires careful geotechnical site assessment and design of ground treatment. The road alignments consist of at grade and elevated roadways involving specialized and unusual designs and foundation solutions.
2009-ongoing
MORE

DETAILED DESIGN AND SUPERVISION FOR NEW EAST COAST EXPRESSWAY (PHASE 2), TERENGGANU. PACKAGE 5B, CH60, 000M (SERI BANDI) TO CH67, 000M (KG.CHABANG), DAERAH KEMAMAN, TERENGGANU
Jabatan Kerja Raya (Public Works Department) JKR
Detailed design and construction of 7 Km new expressway (R6) two lanes dual carriageway along Lebuhraya Timur Fasa 2 (Package 5B CH60,000m (Seri Bandi) - CH67,000m (Kg. Chabang) and 2 bridges over Sg. Air Jernih. The project team was awarded Best Project Management award to this Project team.
2007 - 2010
MORE

OVERPASS AT THE JALAN KUCHAI LAMA
Dewan Bandaraya Kuala Lumpur
Design and supervision of Overpass at Jalan Kuchai Lama Jalan 1/1116B Junction, Kuchai Entrepreneurs Park, Kuala Lumpur.
2002 - 2008
MORE

UPGRADING OF FEDERAL ROUTE 8 FROM BENTONG TO KUALA LIPIS, PAHANG DARUL MAKMUR. PACKAGE 1, SEGMEN 4 (RAUB-BENTA), DAN SEGMEN 5 (BENTA BY PASS)
Jabatan Kerja Raya (Public Works Department) JKR
Detailed Engineering design for Package1, Segment 5 and Segment 8 of Bentong Kuala Lipis New Road, upgrading and widening of existing road in hilly terrain.
1995 - 2000

CONSTRUCTION AND DESIGN OF JALAN CROSS BAN 4/JALAN SG. PANJANG, SABAK BERNAM, SELANGOR
Jabatan Kerja Raya (Public Works Department) JKR

Preparation of technical and economical feasibility. Detailed design and construction of the 20KM new road embankment founded on very soft marine clay. Works involved careful geotechnical evaluation and ground improvement using vertical drains. Construction required considerable care as road is located on and forms a part of existing canal system under purview of Drainage and Irrigation Department (JPS)
2001-2004
MORE

EAST COAST HIGHWAY (JALAN RAYA TIMUR-BARAT), FASA II, SEKSYEN BARAT, PAKEJ V, TITI KARANGAN-KUPANG, KEDAH
Jabatan Kerja Raya (Public Works Department) JKR

To provide mid construction designs and supervision of 32km highway with four number bridges from Titi Karangan to Kupang as part of the highway connecting Butterworth to Grik on the East-West Highway as part of East West Highway link.
1995-1997-2002-2003
MORE

NEXT PAGE >>

 

PROJECTS/SERVICES
Master Plans   Infrastructures   Structures    Sewerage    Roads & Bridges     Geotechnical    Environmental   

We are at:
2A, PUSAT REKREASI SHANG VILLA, LOT G-3, JALAN SS7/15, 47301 KELANA JAYA, PETALING JAYA,
Selangor, Malaysia.
Telephone: 603 - 7806 1638, Fax: 603 - 7806 1138

Email : askgea@gea.com.my  

Home Page     Services    Our Clients     Projects    Careers    News    Documents    Publications    Books Home Page    Services    Our Clients     Careers     Documents    Books by GEA: the Engineer    Slopes Made Simple