New road network development for the klia2 together with associated works at Kuala Lumpur International Airport, Sepang.
 
Detailed design and construction of more than 20km of road including landside road network approaching the  air side service and security road.
 
The road alignments consist of at grade and elevated roadways involving specialized and unusual designs and foundation solutions. Elevated road involves elevated U-Turn, two bridges and connects to the Main Terminal Building and Integrated Complex. Part of this road system will be handed over to Public Works Department (JKR).
 
The project is located on very soft peaty subsoils conditions which requires careful geotechnical site assessment and design of ground treatment.