Continuation of the completed LPT 1 from Karak to Kuantan and together with KL-Karak Highway tol  form an expressway linking Kuala Lumpur and Kuala Terengganu. GEA was responsible for Package 5B from CH 60,000 (Seri Bandi) to CH 67,000 (Kg Cabang) which included two lane dual carriageway, 2 bridges over Sg. Air Jernih,  14 numbers of box culverts and ground treatment for soft grounds  using  vertical drains.
This project team was awarded Quality Award for the "Best Construction Management  2010"